Calera, Alabama

Location Capabilities for Calera, Alabama Facility

Located in central Alabama, the Calera facility processes solid, non-hazardous alternate fuel materials to use as fuel to manufacture cement on site. Calera also accepts iron, silica, and alumina wastes, which are non-hazardous raw materials incorporated into cement as raw material substitutes.

LOCATION AT A GLANCE

Type of Operations:
Non-hazardous alternative solid fuel materials and non-hazardous raw materials.
Commencement of Operations
2006
Owner/Operator
Argos
Materials Receipt
Truck
Hours
M–F: 7am–5pm
(additional hours available as necessary)

MATERIALS HANDLED

  • Paper
  • Wood
  • Rubber strips
  • Carpet
  • Textiles
  • Shingles
  • Oily rags
  • Plastics
ASF & ARM RECEIVING SPECIFICATIONS

  • 5,000 BTU Minimum
  • 0.15% chlorine
  • No free standing water
    Other specification apply please contact us for more detail.
OTHER SERVICES

  • The facility is able to accomodate small containers.
GETTING STARTED

  1. Fill out a profile
  2. Mail your representative sample to your local Systech representative
  3. Receive approval letter
  4. Submit a credit application
  5. Finalize terms and contract
  6. Schedule waste load delivery to Systech facility
  7. Build your reputation as a green company